GUIDE · VULNERABILITY AND TESTING

Reading a penetration test report and turning it into an action plan

By the end of this guide you will know how to read a penetration test report without getting lost in technical detail, how to rank the flaws by impact, and how to turn them into a plan with owners, deadlines and checks. The aim is to reach decisions that management can approve in a single meeting.

Updated october 2026
8 min read
Altovar Technical Editorial Team

1. Why the report is only a starting point

A penetration test report is often long, technical and full of terms that management does not know. Many businesses read it once, file it and do nothing. Its value lies not in the document but in the actions it triggers. A good report describes the flaws, how they were demonstrated and how to fix them. Your job is to turn this content into decisions with owners and deadlines.

The first mistake to avoid is treating all items as equal. The second is fixing the simplest ones without looking at those that really matter to the business. The third is considering a flaw closed once a fix has been announced, without verification. To avoid these, you need a reading method and a person accountable for the decisions. If that person does not yet exist, the first decision to make is precisely this: who signs off the choices about fixes.

2. What you need before reading

Before opening the report you need three things. The complete document, including the appendix with the evidence, because the executive summary is not enough to understand priorities. The inventory of the systems involved, so you can match each flaw with the right owner. And the scope agreed in the contract, so you know what the test covered and what it did not. A line on the type of access granted and the time period gives context for where the flaws were found.

Also set up a channel for questions. Reports often contain passages that need clarification: unclear evidence, a flaw whose impact is not obvious, a fix that seems not to apply to your environment. Ask the provider to remain available for these questions, and record the answers in the report, because they become part of the decision. When a question remains unanswered, flag the doubt in the plan as an open item, rather than resolving it by assumption.

3. The steps to turn it into a plan

Follow this sequence. Each step prepares the next, and the result is a list of actions that a manager can approve in a single meeting. The format matters: a table with one row per item, showing owner, deadline and proof of closure, is easier to discuss than a long document. Keep the items in priority order, so the discussion starts with what matters.

  1. Read the executive summary and note the main themes, without getting stuck on technical detail.
  2. Check the scope and compare what was tested with the systems you consider important.
  3. Rank the flaws by impact on the business and by likelihood of exploitation, using the information in the report.
  4. Group the flaws by root cause, for example a repeated configuration or an outdated library.
  5. Assign each group an owner, a deadline consistent with the risk and a description of the fix.
  6. Plan the verification of each fix, and define which proof you will accept as closure.
  7. Update the vulnerability register and report the status to management, with the exceptions to approve.

4. How to read the severity given in the report

The report almost always assigns a severity to each flaw. This rating is a starting point, not a verdict. The tester calculates it based on the nature of the flaw and the conditions of the test, but does not know your full context. A flaw rated serious may have low impact if the system is isolated, and one rated medium can become critical if it links to personal data or an exposed service.

To adjust the rating, use your inventory. Ask yourself what data the system touches, who uses it, whether it is exposed, and how hard it would be to replace. Record the final priority and the reason. This step matters in the dialogue with the provider too, because it lets you discuss the rating with concrete arguments, rather than accepting or rejecting it wholesale. If the discussion ends in agreement, write it in the plan with the date and the names of the participants.

5. Common reading mistakes

Reading errors produce plans that look complete but change nothing. Recognising them in advance helps you avoid wasting the meeting on sterile debate. It helps to have the list reread by a colleague who did not take part in the test, because they immediately see what is written ambiguously. Reading the list aloud often brings out sentences that do not make sense.

  • Fixing the easiest flaws first, even if the affected system matters little.
  • Ignoring the attached evidence and trusting only the description.
  • Assigning items to the IT department rather than to the owner of the system.
  • Closing an item with the sentence 'the fix was done', without a new verification.
  • Not separating existing flaws from new ones, making comparison with the previous test impossible.

6. How to verify that a fix works

Verification is the most neglected step. A declared fix is not a verified fix. Ask the provider or your own team to state what was changed, and plan a new test that demonstrates the flaw can no longer be exploited. Sometimes a targeted scan is enough; in other cases a manual check is needed, to be agreed with whoever carried out the test.

Keep a record of the test: date, the person who carried it out, the result and a reference to the original item. This documentation shows that the business managed the risk, and it is needed both for customers and for any audits. If the verification fails, the item reopens with a new deadline, and the reason is noted. The reason should be described in precise terms, because it will be the first question if the matter is reviewed.

7. What to do after the plan

The plan is not a document to be closed, but the starting point of the next cycle. Present management with a summary of a few items: the critical ones, the overdue ones and those requiring an investment decision. Do not bring the full list to the meeting, because nobody will read it to the end. The detail stays in the register, accessible to owners. Anyone who needs technical detail knows where to find it.

Also plan the next test. A comparison between one report and the next shows whether the flaws recur, whether the causes have been eliminated and whether the process is improving. If the same flaws return, the problem is not technical but organisational: a development or purchasing process that does not take security into account. When the problem is organisational, a technical fix alone solves nothing.

8. How to get started

This week, take the latest report you have received, or request a copy if you do not have one, and read only the summary and the table of items. On one page, note the three most important flaws for your business and the owner of each. You do not need to complete the plan: you need to understand which decisions it requires. The rest will come with the work on individual systems, one at a time.

Then arrange a short meeting with the owners of those systems, and ask them to decide a deadline and a proof of closure for each. If there are no recent reports, the first step is to commission a well-defined test. The plan comes from decisions, not from the document. Whoever reads the plan must be able to say yes, no or defer on every line, otherwise the plan is not yet ready.

Frequently Asked Questions

How long does it take to read a report?

It depends on the length and complexity of the perimeter. Reading the summary and the table of items can be quick, but turning the report into a plan requires focused work, especially if comparisons with system owners are needed. Do not try to do everything in one session. Work in stages, and leave room for questions.

Do I need to understand every technical detail?

No. You need to understand the impact, the system involved and the action required. Technical details are for your team and the provider to fix things. Ask that the report includes a summary for management in plain language. If it does not, make it a requirement for future tests.

What does it mean that a flaw has been accepted?

It means the owner has decided not to fix it for now, recording the reason, the compensating measures and a review date. It is a legitimate decision if it is documented and approved. It is not if it is implicit or if the date is missing. An accepted risk must be reviewed periodically, because the context changes.

Should the test provider help me with the fixes?

The contract should state what is included. Usually the provider explains the flaws, suggests fixes and may run a verification after the work is done. The technical fix is the responsibility of whoever manages the system. Ask in writing how much support is included, how verification works and who is responsible if a fix does not work.

How do I communicate the plan to the business?

Use language focused on consequences: which activity could be affected, which data is involved, which decisions are needed and how urgent they are. Avoid technical jargon and present a few items at a time. The manager must know what to approve and what remains under control. Clear communication makes approvals easier and reduces endless discussion.

About this content

General informational guide. Regulations and technical requirements change over time: always check the official sources and assess your specific case with a qualified technical or legal advisor.

GET IN TOUCH

Talk to our team.

We'll show how Altovar integrates into your infrastructure. No commitment, no sales pitch. Just a technical conversation.

BOOK A DEMO →